print? Print this page

PremierPack

Fitting any of our CDC, CDX or CDS* boilers with the PremierPack wall-mounting jig automatically adds an extra 2 years to the standard guarantee.

Features

  • Cyclone protection
  • PRV pipe terminal
  • Earth bonding plate
  • Fitted pipe clips
  • Increases boiler guarantee
  • Pipe cover tray
  • Pipes at clip distance from wall
  • Split flow tails
  • Variable fixing point plate

PremierPack incorporates the Alpha Cyclone device which uses centrifugal force to remove any debris from the heating system. This technology is proven to reduce instances of boiler failure through damage to the pump.

It also comes with a host of premium features that make the boiler installation quicker and easier. These include an integral pipe clip plate with variable fixing points, and a copper earth bonding plate pre-cut to fit the boiler pipework configuration.

Once PremierPack is in place, piping-up can be completed prior to the boiler being hung. The boiler simply fits on to the jig’s shelf bracket and is easily connected using integral brass swivel fixings.

*Excludes CD50S, CD70S, CD90S and CD115S.

Technical
Specification
Document
Downloads
Latest News
5 year guarantee on a new Alpha boiler
Fernox TF1 now comes as standard with selected Alpha boilers and to celebrate we’re offering a 5 year guarantee until end 2010...more
Heavyweight guarantee for a lightweight boiler
From 1st September 2010, our CDR heating-only boilers will come with an improved 3-year parts and labour guarantee as standard...more
View All News >