print? Print this page

PremierPack

Fitting any of our InTec boilers with the ingenious PremierPack wall-mounting jig automatically extends the standard guarantee by 2 years. Depending on the boiler model, this means up to 7 years parts and labour cover.

Features

  • Cyclone protection
  • PRV pipe terminal
  • Earth bonding plate
  • Fitted pipe clips
  • Increases boiler guarantee
  • Pipe cover tray
  • Pipes at clip distance from wall
  • Split flow tails
  • Variable fixing point plate

PremierPack incorporates the Alpha Cyclone device which uses centrifugal force to remove debris from the heating system. This technology is proven to reduce instances of boiler failure through damage to the pump.

It also comes with a host of premium features that make the boiler installation quicker and easier. These include an integral pipe clip plate with variable fixing points, and a copper earth bonding plate pre-cut to fit the boiler pipework configuration.

Once PremierPack is in place, piping-up can be completed prior to the boiler being hung. The boiler simply fits on to the jig’s shelf bracket and is easily connected using integral brass swivel fixings.

Technical
Specification
Document
Downloads
Latest News
New Alpha courses prepare installers for future of heating
In recognition of the need for today’s installers to increase their skills set, Alpha has launched two new training courses for 2012...more
Powering through Ecobuild
Alpha is bringing a host of new products to Ecobuild 2012, extending our range to include renewable products that work in conjunction with existing boiler offerings...more
Christmas opening hours
Please check our opening hours over the festive period in case you require any assistance with your boiler...more
Safeguard your boiler this winter
The new InTec Trace Heating Kit provides ultimate protection from frozen condensate pipes...more
View All News >
Follow us on Twitter Visit us on Facebook